Calculate your savings ESEN Book a demoDemo

The software custom sportswear is produced with

Whether you make it from scratch — in your own factory or with external workshops — or you decorate distributor blanks. One system, from design through to final delivery.

More than 800,000 garments produced with Sublier, across different factories

DashboardOverall production status
0Active orders
0Orders in progress
0Orders at risk
0Critical orders
0Open reworks
Problems and alerts
CRITICALOT-0251 Continuous sublimation · Plotter A-B · standard paper 18 %
CRITICALOT-0249 DTF transfer · minimum profitable run not reached 6 %
AT RISKOT-0247 Combined 3 fabrics · T1 T2 T3 sublimated · Plotter A-B 64 %
AT RISKOT-0246 Sewing · waiting for semi-finished item 41 %
Upcoming deliveries
WEB-0024CD Sant Quirze Oct 05in_production
WEB-0023CB Terrassa Oct 07collecting
Today's loadLive
Production planner Auto-replan Generate plan
21Active work centers 985.0 hWeek's capacity 68 %Pending load 106 uIn production
Today Sep 28 — Oct 4, 2026 PersonMachineMy centers
Work centerMon 28Tue 29Wed 30Thu 1Fri 2
Artwork layout 1Person500 u/h · 7.5 h/day 2.1/7.5h 5.4/7.5h 1.2/7.5h ——
RIP layoutPerson360 u/h · 7.5 h/day — 1.8/7.5h 4.9/7.5h 2.0/7.5h —
Plotter AMachine28 u/h · 18 h/day 4.2/18h 11.6/18h 12.4/18h — —
Plotter BMachine28 u/h · 18 h/day 13.1/18h 17.4/18h 19.8/18h 3.6/18h —
CalenderMachine120 u/h · 14 h/day — 3.0/14h 9.2/14h 8.1/14h 2.4/14h OD
Saturation ≤ 50 %≤ 80 % ≤ 100 %> 100 % Plotter B goes over on Wednesday
What's on your plate today Plotter B · morning shift Live
1 Printing · continuous sublimationOT-0251 · 44 units · standard paper IN PROGRESSFinish
2 Printing · T1 fabric 4OT-0003 · 30 units · RIP laid out AVAILABLEStart
3 Printing · T2 fabric 3OT-0003 · 30 units WAITING FOR RIPStart
4 Rework reprint10-001-LEO MARTÍNEZ GÓMEZ · 1 unit · XL · number 22 REWORKStart
Everyone sees their own queue, in their own order. What is blocked does not show up, and what comes out wrong lands here as a rework on that garment, not on the whole order.

Connected to what you already use

HoldedpartnerPrestaShopWooCommerceShopify StripeRedsysPayPal API REST HoldedpartnerPrestaShopWooCommerceShopify StripeRedsysPayPal API REST

Three ways to produce

Almost no factory does only one.

And you don't have to choose. The same order can carry garments you make, blanks you buy and decorate, and sewing that goes out to a workshop: to Sublier it is all one order.

You make it end to end

«I don't know what it costs me, how much I can produce, or why I'm late.»

Fabric, cutting, sewing, sublimation, DTF and embroidery. Your own catalog and patterns, repeated season after season.

You decorate distributor blanks

«How many times have I redone a whole order because of four shirts?»

You buy the garment finished and add numbers, names, crests and sponsors. Dead stock, mid-season replenishment and the back-and-forth of artwork with the club eat your margin.

You produce with external workshops

«It is outside, and until it comes back I don't know where it stands.»

Outsource without losing control: in Sublier an external workshop is just another work center. It is planned, loaded and reported on as if it were inside your factory.

Calculate your savings

The argument is not the price. It is the cost of not having it.

It is not an invoice that lands on your desk: it is work you are already paying for that could simply not be done. Four questions, no sign-up and no sales call, and you leave with your own figure.

A month, in work that could simply not be done

≈ 0 €

every month

≈ 2,000 €Keying in and chasing orders by handFrom email or WhatsApp into the system: 6 h a day between everyone
≈ 1,000 €Redoing what comes out wrongThe whole order because of four shirts
≈ 400 €Loose tools you already pay forTasks, CRM and spreadsheets all over the place

The Sublier Core costs 490 € a month, and it takes all three off the table. The rest of the features switch on when you need them, and each one saves its own share.

Example · a factory with 80 clubs. Your numbers give a different figure, and the simulator works it out module by module.

Calculate your savings → Four questions · five minutes · no sign-up, no sales call

What nobody else has

Three clubs order on their own. The workshop produces in flow, not order by order.

Sizes, numbers and names come in through the club store, at the club’s own pace, or your sales rep enters them if the club would rather not. On closing, Sublier does not send three orders to the workshop: it splits the 106 garments and regroups them according to whatever suits the workshop — process and fabric, and pattern or thread color too if needed —, not by club. What came in loose goes out as three orders printed in a single run: fewer machine set-ups, fewer meters of paper and more garments per hour with the same people.

In · three club orders · scroll over it

CD Ribera44 units · 3 references
10-CAM64JerseyXL22LEO
10-PANT2PantsXL22LEO
10-SUD8SweatshirtM7PAU

and 41 more lines, each with its size, its number and its name

CB Alameda32 units · 2 references
20-CAM64Women's jerseyM4JAN
20-PANT2PantsL11MARC
20-CAM64Women's jerseyXS3ONA

and 29 more lines

UE Aranda30 units · 3 references
30-SUD12Sweatshirt, 3 fabricsXS1MARC
30-CHAN4TracksuitS2BERTA
30-CAM64JerseyM3PAU

and 27 more lines

Collection 1

Sorted by

Process Fabric Pattern Thread

0 units

loose, from three clubs

Out · three production orders

OT-0001Continuous sublimation · Fabric 1 52 unitsRibera + Alameda
OT-0002DTF transfer 24 unitsRibera + Aranda
OT-0003Combined 3 fabrics · T1 T2 T3 30 unitsAlameda + Aranda

The real cost

What every garment costs, size by size

Every product inherits its materials and its operations from its pattern, and the cost is worked out for every size. Change a fabric price and the whole catalog is recalculated.

Home jersey, men's10-CAM64 · CD Ribera
ItemXSSMLXL2XL3XL4XL
Materials
Interlock fabric2,622,843,053,273,483,703,914,13
Trims0,220,220,220,220,220,220,220,22
Operations
Artwork layout · 60 min0,430,430,430,430,430,430,430,43
Printing · Plotter A · 2.14 min0,460,460,460,460,460,460,460,46
Laser · 1.13 min0,240,240,240,240,240,240,240,24
Sewing · 0.96 min0,470,470,470,470,470,470,470,47
Cost4,444,664,875,095,305,525,735,95

Swipe the table to see all eight sizes →

A 4XL costs 1.51 € more than an XS, and almost all of it is fabric. If you sell both at the same price, you know exactly what that decision costs you.

Combined processes

The lead time is set by the longest branch, not by the sum

A three-fabric sweatshirt is not one process: it is three running in parallel that meet at assembly. Sublier plans them as branches and waits for all three.

T1 Fabric 4 · sublimated

Artwork layoutAvailable
Lay out RIPWaiting
Printing · Plotter BWaiting
CalenderWaiting
Laser 1Waiting

T2 Fabric 3 · sublimated

Artwork layoutAvailable
Lay out RIPWaiting
Printing · Plotter AWaiting
CalenderWaiting
Laser 1Waiting

T3 Fabric 2 · dyed

MarkedAvailable
CuttingWaiting

Dyed fabric is not printed: it arrives with its color already in. Two steps and then it waits.

Final trunk Sewing and packing · waits for all three branches 30 units · OT-0003

And when a center fills up, the order drops to the alternative one by itself. If even then the date does not fit, the system warns you in advance — not on delivery day — and puts both ways out on the table: a new date, or the overtime it would take to hit the date you promised.

Traceability

Every garment belongs to someone, and the system knows it

As soon as the club closes its collection, every unit gets its unit ID: size, number and name in one code. It is scanned at cutting, at the press and at the box. Whoever is at the station sees the garment, not a row in a spreadsheet.

And if something goes wrong, it is flagged as a rework right there. Nothing is lost: that garment is redone, not the whole order.

10-001-LEO MARTÍNEZ GÓMEZPending
Printfile
Reference10-CAM64CD Ribera · Home jersey, men's
SizeXL
Number22
NameLEO
PatternCAM64-H · men OrderWEB-0001 Prod. orderOT-0001 CustomerCD Ribera
✓ Complete ⚠ Rework

Reworks and reprocessing

The piece is redone, and the data stays

At the station there are only two buttons: if the garment is good, Complete; if not, Rework, with the reason and which parts failed. Sublier flags the issue on those garments, blanks out only the pieces that failed and sends them back to the print queue. Anyone gets that far. What changes is that those reworks group themselves to be redone in a batch, that you know why they keep happening and that the extra minutes and euros come off the order's margin — not off a hunch at the end of the month.

✓ Complete and it shows at the station

Laser 10 / 4 completedLive
10-001LEO MARTÍNEZ GÓMEZXLPending
10-002ÁLVARO DÍAZ MORENOMPending
10-003MARÍA LÓPEZ SANZSPending
10-004SARA NAVARRO GILLPending

Every unit is scanned and closes itself. Nobody writes anything down on a sheet.

⚠ Rework and you mark what failed

New rework10-004-SARA NAVARRO GIL

Reason

Fabric crease Banding Wrong personalization

Part

Front Back Left sleeve Right sleeve Complete

Those two pieces are left blank and go back to the print queue. The rest of the printfile is untouched.

Save reworkreprinting 0 pieces, not the garment
Reworkspending today Close today's reworksReplan allFull Excel
21Reworks
168min · est. reprocessing time
37,80€ · est. reprocessing cost
Unit IDProd. orderFabricSizeError typePartReprocessingOperator
10-004OT-0001White interlockLBanding FrontRight sleevePartiallaser1
10-027OT-0001White interlock2XLFabric crease CompletePartiallaser2
30-022OT-00035211 whiteSWrong personalization BackPartiallaser2

Redoing only the marked pieces comes to 1.80 € and 8 minutes per garment. Redoing the whole garment is 5.30 €.

They group and replan themselves

The reworks of the day do not go one by one. They go into the next print batch together, grouped by fabric and process like any other order, and the system reassigns the center and the date. Nobody stops the production line for one garment or redoes it by hand at the end of the shift.

You know why they happen

Banding48 %
Fabric crease29 %
Wrong personalization23 %

Every rework has a reason, a part, a workstation and an operator. At the end of the month white interlock accounts for 61 % of all banding: that is a purchasing decision, not a suspicion.

You know what margin they eat

32,4 %budgeted margin
30,7 %real margin with reprocessing

The minutes and the euros of reprocessing are added to the order's real cost. The margin you see is the one left after the errors, not the one in the quote — and when you bring them down a point, the factory keeps that point.

Sublier Brand

One core, and everything else on top

The platform works on its own from day one. What orbits around it switches on when you need it, and no module is required for the core to do its job.

Sublier
Club collection Club store Design and size grading Personalization Printfiles RIP layout Planning Workshop and orders Traceability Costing Catalog and patterns CRM Club Manager

The Sublier Method

Lean brought order to the car factory.
Sublier brings order to the custom garment factory.

The Sublier Method was not written on a whiteboard: it came out of a real factory, measuring what fails, why it fails and what it costs. Seven principles, three phases and sixteen protocols that already come inside the software. The platform is the means; the method is the how — and that is why Sublier is not an empty board that everyone organizes their own way.

3phases: Development, Collection and Production
7principles, each one born from a real, measured failure
16protocols, each with its trigger and its minimum data
0steps that start «whenever we can»

The rules that are not up for negotiation

01An order does not exist until development is finished Without a finished product — pattern, costing and printfiles — the sales route does not open. And without confirmed sizes, numbers and names there is no production order. Until then it is an intention: it consumes no capacity and no lead time is promised on it.
02Every step is triggered by an event, not by an emergency No step starts «whenever we can». Each one has its trigger written down, and that trigger is a state in the platform, never a phone call. The work is already planned by the time it reaches the station, it is not handed out by shouting every morning.
03What has no owner and no date does not get done Everything carries an owner and a day: the order, the rework, the fabric purchase, the workshop hand-off. In Sublier nothing is saved without a name and a date, because what is left hanging gets done by nobody.
04Without the minimum data, the step does not start The photo, the thread color, the size. The minimum data for each phase is a block in the platform, not a recommended field: if something is missing or incomplete, the step does not move on. Nothing is produced on a half-finished order.
05Costing unlocks everything else No cost, no margin. No margin, no pricing decision, no prioritizing, no optimizing. It is the first stop in the method, not the last.
06What is not measured cannot be improved Every phase leaves its indicator — real lead time against promised, real cost against costing, reworks and load per center — and the KPI dashboard brings them together. At the end of the month nobody argues about whether it went well: it gets analyzed.
07Automate everything that does not add value Copying sizes from one spreadsheet into another, recalculating a costing by hand, handing out work over WhatsApp, chasing where an order stands: none of that adds a gram of value to the garment, and it eats half the day. What does add it — designing, deciding and manufacturing — stays with people.

And a language of its own, that you end up using

CollectionCostingPatternProcess ConsumablesUnit IDCombinedSemi-finishedReference

Nine words for nine things that had no name before. When your workshop and your office use them the same way, half the misunderstandings are over.

None of this is a PDF to pin on the wall: every principle is a block or a state in the software, so the method cannot be «not applied». The training is on video and is part of the rollout itself, not a separate course: your team learns as the software goes live.

Where Sublier comes from

Sublier was not designed for factories.
It was designed inside one.

Wintym is a teamwear brand with its own factory. We founded it and it was ours for years: it is where all of this was born. Brutal peaks from July to December and a garment that changes with every unit: name, number, sponsor. Every order different from the last.

And the problem was not selling. That worked. There is work for everyone in this sector: no manufacturer can keep up with all the demand that is out there. The bottleneck is not in selling, it is in being able to deliver it.

The problem was profitability, the seasonality of the sector and short delivery times. The delay in approving designs — sponsors arriving late — and getting the stores ready ate into production time, and to make it we had to throw resources in at the last minute: more people, more shifts. We delivered, yes — but on sheer effort and against our own margin. Production was in survival mode.

We did not really know how much demand we could serve.

We ran it on Excel, WhatsApp, kanban tools and generic ERPs. Nothing ever quite worked for us. We produced putting out fires: order by order, in the order they came in or in the order of whichever customer pushed hardest — never in the order that suited the factory.

What explained all of it

The key to this sector is service. Delivering on the dates you committed to. But delivering on time by burning overtime does not hold: no margin, no business. You have to make it, and have margin left over. And that does not come from pushing harder, it comes from putting order into how you work.

What we did

Instead of throwing in more resources, we learned about lean manufacturing, flow production, pull and efficiency, and we studied how other sectors produce. Season after season we applied a system in our own factory, looking for where the real waste was and reorganizing the work so that it stopped happening.

We went from producing one at a time, creating bottlenecks, to producing in flow. Not by buying machines: by organizing production.

And that, in four words, is what Sublier sells: less chaos, more control.

That is where the Sublier Method came from. Not from a whiteboard: from a plant in high season, corrected season after season with the factory running. And as we put the system together, we built our own tools to automate everything that could be automated. Once it was validated — once it was proven to work and not just a hunch — the software was built.

What it delivered, measured

8%
measured in 2025

of revenue, saved in costs

Against the previous year, on the same revenue. Not from selling more: from producing better.

And then the decision was made

We sold the brand and the production side to devote ourselves to helping other manufacturers struggling with the same things we did. Wintym is still producing today, under different owners and with Sublier.

Today that method is software and it runs in several factories. We no longer manufacture: our job now is for factories to produce efficiently and with margin.

Brands already producing with Sublier

Wintym Expertextil Inverse Estampados Luna Kauri Pluralworks Atika Wintym Expertextil Inverse Estampados Luna Kauri Pluralworks Atika

How you start

Five guided weeks, and it is not over until a real order has gone all the way through

Sublier is not an empty program you have to set up blind: it comes with the route already built for the sector. The platform asks you for what it needs — data, machines with their costs, catalog with its patterns — and it does not open the next week until the previous one is closed. You do it yourself, at your own pace — but with the method already set up on your factory and your connectors running. That is what you buy in the rollout, and that is why no two factories start from zero.

WeekWhat gets doneCloses when
1Data: customers, suppliers, consumables and catalogThe data sheet is complete
2Machines, processes and combined processesNo center without a cost
3Products, patterns, semi-finished items and printfilesCatalog with its naming
4Connections: your accounting software, your sales channel, workshop and logisticsThe line count matches
5Users, training and pilot orderA real order has gone all the way through

Without each week’s minimum data, the next one does not open. That is what makes five weeks five weeks and not five months.

What decides the purchase

Cutting your price is not a strategy. Raising your margin is.

In a global, crowded market, price has stopped being what decides. The way out is not cutting: it is winning margin from the inside and getting to the point where working with you is a guarantee.

01Price no longer sets you apart In a global market there will always be someone cheaper. Getting into that war means competing against a cost structure that is not yours.
02Cutting price eats your margin And margin is what pays for the new machine, the sales rep and the bad month. Every point you give away does not come back.
03Margin comes from the inside Fewer hours that add no value, fewer repeat garments, fewer meters of paper. The same order, produced at a lower cost.
04And when you always deliver, the price stops being argued over Working with you becomes a guarantee — and a guarantee does get paid for. It is the only thing that lets you hold your price, or raise it, in a market where almost no one else can hold theirs.

Sublier does not make you sell at a higher price: it gives you what you need to be able to. What every garment costs, the hours that add no value gone, and the real margin of every order in plain sight.

Pricing

One plan, a user scale and no surprises

One subscription, a user scale and one rollout. That is everything you need to get going, and it is right here.

Sublier Brand · Core

490 € /mo

6 users included

  • Club order collection
  • Catalog, patterns and semi-finished items
  • Size-by-size costing
  • Planning on real capacity
  • Orders and work schedule by center
  • Unit ID traceability
  • Reworks and reprocessing
  • KPI dashboard

This is the core, and it works on its own from day one. What orbits around it switches on when you need it.

15 €per extra user per month, and the price per user goes down as you grow
5,500 €rollout, one-off payment. You are not paying us to configure the software: you are paying for the sector knowledge, the method set up on your factory, your connectors running and the guided onboarding that makes going live easy

What it would cost you for your team

6users490 €
8users520 €
12users577 €
20users661 €
30users751 €

The price per user drops in bands as you add people, so growing does not cost you proportionally more.

And on top, whatever you need

CRM and club managementFrom first contact to accepted order, and the record of each club with its rates, its sponsors and its teams.49 €/moper company, with all your users inside
Ecommerce, adaptedAn ecommerce built to sell to clubs: team stores per team, commissions for the club and Club Manager, where the club sees the status of its orders and its account live.290 €/moplus 3,500 € rollout, one-off payment
coming soon Design AutomationSize grading and personalization — name, number and QR — done by the platform on its own.350 €/mo1,500 units included. Beyond that, 0.15 € per unit
coming soon Print AutomationThe print layout with its sequence, optimizing the space and sent straight into the printing software.250 €/mo1,500 units included. Beyond that, 0.15 € per unit

And at go-live, if you need them: migration from another platform, extra training and assisted rollout. Importing your data is free: you do it yourself with the importers.

Ask for a demo and we will show you→ Half an hour, with your own processes and your own orders in front of you

No fine print

Published pricingSubscription, users and go-live. You do not have to call anyone to find out what it costs.
Nothing free without a dateIf there is a trial or a promotion, it is written into the contract with its end date.
No minimum termYou stay because it works for you. If not, 30 days notice and that is it.
Your cost follows your seasonThe core subscription does not move. The extra features — artwork layout, RIP layout — go by volume: more work, they go up; less work, they go down. Your fixed cost turned into a variable one.
Import your data freeCustomers, catalog, consumables and patterns. You upload them yourself with the importers, and if you get stuck we help.
Support that knows the tradeFrom people who have been inside a customization factory, not from a call center.

We do not come from software.
We come from the factory.

We have laid out printfiles, balanced costings and chased an order that was not going to make it. So when you ask something, a ticket does not answer you: someone who has already had your problem does.

Sector judgement, not tech supportNot just where the button is: how other factories solve it We speak your tradeFabric, calender, numbers, costing. No translator in between And we stay with you as you growNew centers, new processes, more clubs: the setup changes with you Open webinarsHow to produce better, told through real cases. Even if you are not a customer yet
Book a demo→

We show you what your operation would look like inside Sublier

30 minutes, with your own processes and orders. No commitment and nothing for you to prepare.

Less chaos, more control.

Book a demo →